Search
Subscribe to Email Updates
-
Recent Posts
Blog Roll
The CB&Q in Wyoming
Wilmington & Northern Branch
The Georgetown Branch
Chesapeake, Wheeling and Erie Railroad
Mike McNamara's Northeast Kingdom Model Railroad
Modeling the SP
The Niagara Branch
The Virginia Midland
White River Division
The Denver, Durango & Silverton Railroad
Notes on Designing, Building, and Operating Model Railroads
Trackside Treasure
Kathy Millatt's Blog
Modeling Kandiyohi, MN in Two Eras
Adena Railroad
Little Snoring RailwayArchives
- November 2019 (2)
- October 2019 (7)
- September 2019 (3)
- August 2019 (3)
- July 2019 (5)
- June 2019 (3)
- May 2019 (4)
Meta
Category Archives: Track Work
Ballast Testing
On Friday and Sunday I put down some ballast on the track on the Northeast end of the layout.
Posted in Track Work
Comments Off on Ballast Testing
Creating and Crossing Lutgens Creek – Part Two
In the last installment about Lutgens Creek I had created the creek bed and painted it tan. The next step was to paint the bottom of the creek bed a darker color and then shade the sides a little. I … Continue reading
Posted in Track Work
Comments Off on Creating and Crossing Lutgens Creek – Part Two
Installing Turnout Controls
I spent some time trying to determine the best way to throw the turnouts on my layout, as you can see in this blog post. After I determined that I was going to use the BullFrog turnout controls I ordered … Continue reading
Posted in Track Work
Comments Off on Installing Turnout Controls
Turnout Control – Sorted!
I’ve been mulling over the issue of how to throw the turnouts on my layout for a while now. I bought a BullFrog controller a while back to test but I was disappointed because it wasn’t working very well. It … Continue reading
Posted in Track Work
Comments Off on Turnout Control – Sorted!
More track work, and wiring!
The last update showed turnouts that had been completed and painted. Last week I installed six of them and some more straight sections of track. I’m pretty much done with laying track until I can get the bridges sorted out … Continue reading
Posted in Track Work
Comments Off on More track work, and wiring!
July 10, 2019 Update
There hasn’t been much progress recently, mainly because we took two weeks off and rode the train across Canada. There will be posts and photos about that later on my other blog. But some progress has been made in the … Continue reading
Posted in Misc, Track Work
Comments Off on July 10, 2019 Update
Hand Building A Turnout
My current track plan has about 12 turnouts (switches) in it. The quality code 83 Shinohara (no longer manufactured) and Walthers (coming soon) turnouts cost about $25-$30 each, even on eBay. That’s a lot of cheddar for turnouts. (About $300 … Continue reading
Posted in Track Work
Comments Off on Hand Building A Turnout