On Friday and Sunday I put down some ballast on the track on the Northeast end of the layout.

Posted in Track Work | Leave a comment

Progress Report – 8 Nov 2019

More and more progress to report. Since the last progress report I’ve gotten the following done: I installed the “fiddle yard” extension, painted the top of it tan, put down the cork roadbed, built two more turnouts to finish the … Continue reading

Posted in Construction | Leave a comment

Progress Report – 29 Oct 2019

I know the last post was about being discouraged, but that doesn’t mean I stopped working on the layout. I took a day or two off to do other things and then buckled down to get back to it. The … Continue reading

Posted in Construction | Comments Off on Progress Report – 29 Oct 2019

Feeling A Little Discouraged…

On Monday I decided to run my locomotives around on the layout to test the turnouts. First I ran the V0-1000 diesel around. Sadly it did not go all that well. It looks like I need to do some re-work … Continue reading

Posted in Misc | 4 Comments

Crossing Lutgens Creek – A Staged Publicity Photo

Since I managed to place the three bridges and lay the three tracks to cross Lutgens Creek I thought it might be fun to stage a “publicity photo”. Still plenty of work to do, but it’s starting to look more … Continue reading

Posted in Misc | Comments Off on Crossing Lutgens Creek – A Staged Publicity Photo

Creating and Crossing Lutgens Creek – Part Two

In the last installment about Lutgens Creek I had created the creek bed and painted it tan. The next step was to paint the bottom of the creek bed a darker color and then shade the sides a little. I … Continue reading

Posted in Track Work | Comments Off on Creating and Crossing Lutgens Creek – Part Two

Universal Scrap Metals

I have a track that runs along pretty close to the backdrop and I’m planning on filling the area with “flats” – buildings with little to no depth. I found a website named Trackside Flats that had a bunch of … Continue reading

Posted in Industries | 1 Comment

Installing Turnout Controls

I spent some time trying to determine the best way to throw the turnouts on my layout, as you can see in this blog post. After I determined that I was going to use the BullFrog turnout controls I ordered … Continue reading

Posted in Track Work | Comments Off on Installing Turnout Controls

Progress Report – 6 Oct 2019

Time for another progress report. Lots of random things have been worked on since the last update. I’ve been adding more details to Lutgens Creek and here is a photo where I am test fitting the bridges and bridge shoes.

Posted in Construction | Comments Off on Progress Report – 6 Oct 2019

Turnout Control – Sorted!

I’ve been mulling over the issue of how to throw the turnouts on my layout for a while now. I bought a BullFrog controller a while back to test but I was disappointed because it wasn’t working very well. It … Continue reading